A Selection of Our Work

Case Studies

RootBridge at the RBGE

Access road for the Biomes project at the RBGE.

RootBridge new site access

Short stretch of RB 50kN used to ramp up to a geocellular system.

New driveway in Kidlington

RB 57kN to allow access to the two new properties.

New Access Roads for a Development in York

RootBridge 50kn HD system with block paving finish.

New Driveway for Housing Development

RB extra heavy was used in conjuction with Geocells to create a driveway through a grove of trees. This allows access for vehicles up to 30 ton.

Beam base for a Carport and Patio

A steel beam structure to provide a zero soil compaction base in the RPA of a mature beech tree.

Parking Bays by Existing Tree

Two trees needed protecting in a carparking environment - Rootbridge was used to make the parking spaces possible.

System Over Roots by Cafe Area

The Rootbridge system can be tarmacked or paved over, to provide a seamless finish

Building Root Protection

Used to bridge a gap between a new roadway and existing hardsurfacing. Zero soil compaction

Staircase Leading Past Existing Tree

The Light Duty version used to provide a sturdy base for a staircase.

More coming soon...